[B]AE Systems in Barrow is due to transport two heavy loads from the Devonshire Dock Hall to the Top Yard via Bridge Road next week.
The first move will take place on Monday 2 July at 9.15am and the second on Tuesday 3 July, also at 9.15am.
During each move, police road blocks will be in place on Walney roundabout and Bridge Road causing minor disruption to traffic for around 20 minutes.