• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Tuesday, July 22, 2025
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Jobs
  • Food & drink
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Jobs
  • Food & drink
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home News

Nine tonnes of plastic removed from River Keekle in first phase of restoration

by Cumbria Crack
19/12/2019
in News
Share on FacebookShare on Twitter
The River Keekle before and after the restoration of the trial site

The first phase of a £1.5m partnership project between West Cumbria Rivers Trust and the Environment Agency to remove a plastic liner from the bed of the River Keekle is now complete, with a bench and picnic table made from the recycled plastic marking the spot.

The project will remove the liner, which is causing erosion and plastic pollution, from a 2.5km stretch of the river. In the first phase this summer, nine tonnes of plastic were removed from a 170 metre trial site and the riverbed restored with stone. The project team experimented with different methods of removing and recycling the plastic to find the best way to complete the remaining 2.3km restoration in summer 2020.

The plastic removed from the trial site

The plastic removed from the Keekle is being recycled, with the sheets shredded, cleaned and used in the manufacture of recycled plastic lumber. Some of the plastic from the trial site has been made into a bench and picnic table at Walkmill Community Woodland car park to mark the project’s success so far. The recycling and manufacture has been done by Dumfries-based Plaswood from Berry BPI, who have generously supported the project by covering some of the costs involved.

The West Cumbria Rivers Trust team with local residents at the new picnic table

Luke Bryant, Project Manager at West Cumbria Rivers Trust, said: “The first phase went wonderfully and was really successful. We did a huge amount of planning and preparation which meant we could hit the ground running during the good weather in June and July and the work to remove the plastic and restore the riverbed took less than four weeks.

“We’re already seeing massive positive changes in the restored section. There’s natural gravel, cobbles and sediment deposition in places which is proof that the river is re-naturalising itself now the plastic isn’t in the way. We estimate that 100 to 150 tonnes of plastic will be removed next year, leaving the full 2.5km stretch restored, with the potential to become great habitat for fish spawning.”

The new picnic bench

A key reason for the success of the trial was the river being temporarily diverted around the site while the work was completed, enabling the team to work in a dry river. With a 170m stretch it was possible to pump the river through a temporary pipe, but an alternative plan was needed for next year’s 2.3km section. The river will be diverted into an adjacent channel while work takes place and then reconnected afterwards.

The project is part of the Environment Agency’s River Restoration Programme in Cumbria – one of the biggest portfolios of river restoration projects in the UK.

This year’s trial phase was funded by the Environment Agency at a cost of £175,000. Phase two has been awarded £1.3m by the European Agricultural Fund for Rural Development’s Water Environment Grant.

Previous Post

Wild swimmers celebrate Winter Solstice in English Lake District this weekend

Next Post

Lake District Reverend revs up for marathon mission – in training for May 2020

Have you read?

Come along and meet some of the Barnhill rescue donkeys at Westmorland and Dales Festival
What's on

Come along and meet some of the Barnhill rescue donkeys at Westmorland and Dales Festival

22/07/2025
A generic picture of police tape running across a road and police cars are in the background
Latest

Nine-year-old girl taken to hospital after motorbike collision in north Cumbrian town

21/07/2025
Four cows successfully rescued from quicksand
News

Four cows successfully rescued from quicksand

21/07/2025
Driver leads police on 130mph chase on Cumbrian A road
News

Driver leads police on 130mph chase on Cumbrian A road

21/07/2025
Thomas the Tank Engine fans urged to go full steam ahead at Mitchells Vintage and Antique Toy Sale
Sponsored

Thomas the Tank Engine fans urged to go full steam ahead at Mitchells Vintage and Antique Toy Sale

21/07/2025
£19 million West Cumbrian Community Diagnostic Centre opens
News

£19 million West Cumbrian Community Diagnostic Centre opens

21/07/2025

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: admin@cumbriacrack.com

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Sport
  • Carlisle United
  • Business
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Jobs
  • Food & drink

© 2025 JNews - Premium WordPress news & magazine theme by Jegtheme.