
A West Cumbrian road will close for 10 days from Monday for improvement work.
Work will start on the road, between Westnewton and Allonby, on Monday November 18. It will take place Monday to Friday, from 7.30am to 4.30pm, with no weekend work planned, weather permitting.
The pre-surface dressing patching work will repair the existing road surface before surface dressing.
The process involves removing and trimming defective surfacing material, followed by patching with hot bitumen to seal the surface and prevent water access.
Vehicle access for residents and businesses will be maintained whenever possible, and specific access needs can be discussed with on-site staff. Full access for emergency service vehicles, pedestrians, and dismounted cyclists throughout the works.
Recycling and waste collections will not be disrupted, and information about bus stop relocations will be posted at current bus stops. For any queries regarding bus routes, passengers are encouraged to contact Stagecoach directly.