• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Saturday, June 13, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home Latest

Opening of £6.8 million Grange Lido delayed

by Cumbria Crack
09/05/2025
in Latest, News
Share on FacebookShare on Twitter
Grange Lido

The opening of the £6.8 million revamped Grange Lido has been delayed.

Work began on the project in April 2023 and it was due to open this summer, but Westmorland and Furness Council said that during the latter stages of the project, it had become clear that concrete repairs need further assessments.

It said: “With the majority of work now completed, the council is working with the contractor, RH Irving Construction, to fully assess the necessary work required to bring the project to conclusion.

“Unfortunately, this means it is unlikely that the lido will open this summer. A revised programme of work will be received in the coming weeks following a detailed assessment. Once finalised, a new opening date will be confirmed.

“Clearly, this will be disappointing to residents of Grange and the various interest groups; however, the council remains committed to ensuring that the Lido receives the investment needed to safeguard its use for the future.”

One of only four remaining listed coastal lidos in England, the lido was built in 1932 and remained open for 61 years until its closure in 1993, due to low usage and rising operational and repair costs.

It remains the earliest and most complete example of a 20th century listed seawater lido in England.

Jonathan Brook, leader of Westmorland and Furness Council, said: “The lido is a significant and unique asset, recognised not only in Grange and around Morecambe Bay, but across Westmorland and Furness and beyond.

” While it is frustrating that the construction phase must be extended due to further assessment of the repairs required to complete the project, it highlights the complexity of working with historic assets of this nature.

!It is important that we get this right, understanding that the Lido project seeks to restore this important structure after more than 30 years of closure and several previous attempts to bring it back to life.

“With the vast majority of work on the Lido and promenade completed, they look fantastic, and I can’t wait to open the Lido to the public after decades of it being lost to the community.”

The project aims to reopen the lido site with a temporary infill of the pool, creating a new multi-use public space from what had become a derelict and deteriorating Grade II-listed site.

The council said: “The project protects the site’s significant social and cultural heritage in a way that does not preclude the future reopening of the pool. The temporary pool infill uses materials that are both removable and recyclable.”

Completed work at the lido includes an upgrade to the central and focal pavilion building, creating flexible and adaptable space suitable for future occupation and development by a partner.

Additional work includes the creation of an accessible entrance from the promenade and the insertion of a removable landscaped feature within the former pool area.

The male and female changing accommodation has been stabilised, with works to the roof and terraces completed, along with security upgrades, cleaning, and external decoration.

Significant structural and architectural work have also been undertaken, including strategic concrete repairs to the diving board structure.

Work on the 1,900 metre promenade included the removal of unstable sections of the sea defence wall, application of a durable coating to the promenade’s upper surface, and a combination of precast and in-situ concrete repairs to the upper edge bull nose and sea-facing elevation of the sea wall.

A new playground area has also been installed.

Colours on the railings of the promenade have been put in plane, aimed at helping to pinpoint the location in the event of an emergency.

The idea was suggested by Jane Strawbridge, chair of Grange Community First Responders.

She said: “Essentially, it is a simple solution that, following a 999 call, will help the emergency services and callers to effectively identify the location of a casualty along the mile-long promenade. Over the years, Grange First Responders and ambulance crews have lost valuable time trying to locate patients. A swift response is vital in life-threatening situations involving cardiac arrest, breathing difficulties, or serious injury.

“By dividing the promenade into four sections based on access points, each section will be marked with a small block of a specific colour on the railings. Once the work is complete, we will notify the North West Ambulance Service of the colour assigned to each section, enabling emergency teams to use the appropriate access point in response to a 999 call.”

​

Previous Post

Sycamore Gap pair told they face lengthy jail sentences

Next Post

Tackling youth anti-social behaviour in Penrith

Have you read?

Bid to rebuild West Cumbrian secondary school
News

Bid to rebuild West Cumbrian school set to get go-ahead

13/06/2026
Whitehaven Civic Hall to close with immediate effect for safety work
News

£500,000 for asbestos work at Whitehaven Civic Hall

13/06/2026
a pair of brown and black hiking boots with red accents on a stone surface
News

New footpath opens near Kendal

13/06/2026
Milestone production for ACT Youth Theatre
What's on

Milestone production for ACT Youth Theatre

13/06/2026
Work to prevent waste from South Cumbrian landfill site slipping into sea
News

Coastal erosion work set to start on South Walney landfill site

13/06/2026
Today’s mobile speed camera van locations
News

Speed camera vans in Cumbria today

13/06/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.