• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Tuesday, June 9, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home Latest

Contractor announced for Pooley Bridge design

by Cumbria Crack
11/04/2018
in Latest
Share on FacebookShare on Twitter
Pooley Bridge artist impression

[A] new bridge over the river Eamont at Pooley Bridge is a step closer today with the announcement that north west based Eric Wright Civil Engineering Ltd have been appointed as the contractor for the design of the replacement bridge.

The appointment follows a competitive procurement process which saw a number of companies put forward proposals. Eric Wright Civil Engineering Ltd, together with their design partner GHD, has extensive experience of bridge design and construction and was judged to be the right organisation to take this prestigious project forward.

Cllr Keith Little, Cabinet Member for Highways and Transport, said: “This is welcome news and it’s great to see a regional organisation will be taking a lead on the design of what I hope will be an iconic new bridge. They have a proven track record both here in Cumbria and elsewhere in the country and I’m sure they will do an excellent job.”

Eric Wright Civil Engineering Ltd and GHD have committed to a detailed design and engineering solution that remains as faithful as possible to the concept designs that have already been developed, whilst giving full consideration to the impact of the construction phase on the village, its residents and businesses.

Diane Bourne, managing director of Eric Wright Civil Engineering, added: “We’ve been working closely with Cumbria County Council for a number of years to overcome the damage left following the 2015 floods and the new Pooley Bridge design and construct will provide resilience against extreme bad weather to ensure the infrastructure continues to connect communities, businesses and create opportunities for new development for future generations.

“Our highly experienced site team are working closely with the Council and all those involved to minimise disruption during the demolition and construction, and ensure a smooth delivery.”

The proposal submitted by Eric Wright Civil Engineering Ltd includes the design of a temporary footbridge across the river which would be installed during the construction phase, and before the current temporary road bridge is removed.

Chair of the Pooley Bridge Footbridge Taskforce, Mark Vause commented: “We are absolutely delighted that the project is progressing and that plans include a footbridge. It is of vital economic and social importance to retain a link to both sides of the valley during construction of the permanent road bridge.

“Our message is clear, Ullswater Valley will be very much open for business throughout the entire construction period and it is hoped that many people will show the support witnessed in the aftermath of 2015’s Storm Desmond, when crowds of well-wishers (both locals and visitors) made a point of visiting Pooley Bridge to watch progress and support the local pubs, hotels, shops and many other attractions.”

Once final designs and costings have been sufficiently developed, a final decision will be required by the County Council on the appointment of the contractor for the remaining construction phase. Construction works are scheduled to commence on site by the end of 2018.

Previous Post

‘The Game of Long Life’ – new campaign launched to increase bowel cancer screening uptake

Next Post

Carruthers puts new name on snooker trophy

Have you read?

Latest

Carlisle woman in court accused of stabbing man

08/06/2026
‘Cat man’ spotted in West Cumbria sparks online panic
Latest

‘Cat man’ spotted in West Cumbria sparks online panic

08/06/2026
£25m loan for South Cumbrian housing association
Latest

£25m loan for South Cumbrian housing association

08/06/2026
A generic picture of police tape running across a road and police cars are in the background
Latest

Man who died following early hours A66 crash named

08/06/2026
Shining a light on Carlisle’s little-known history
Latest

Horse rescued from River Eden at Appleby Horse Fair

07/06/2026
In pictures: King of the Gypsies urges people not to miss out on Appleby Horse Fair
Latest

Horse found dead at Appleby Horse Fair

06/06/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.