• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Monday, July 13, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home News

Major upgrades planned for A69 trans-Pennine route

by Cumbria Crack
14/08/2019
in News
Share on FacebookShare on Twitter
An artistic impression of how the A69 Bridge End junction will look

Major upgrades to a northern trans-Pennine route are being planned to reduce congestion, and improve journey times and safety for the thousands of drivers who use the route every day.

A multi-million upgrade to the A69 Bridge End junction, which will save drivers around an hour a week, and the installation of permanent average speed cameras to improve safety at two locations along the road, are due to start in the next two months.

Highways England project manager Russell Mclean said: “The A69 is used by around 26,000 drivers every day and these essential improvements will make the A69 safer while reducing congestion and improving journeys.

“The Bridge End upgrade will also improve access from the A69 into Hexham, reducing the amount of accidents at the junction and aiding any future proposals to dual the route.”

The permanent average speed cameras are being installed at two locations along the A69, between Hexham West and Haydon Bridge and between Warwick and Corby Hill following a safety review.

Work between Hexham and Haydon Bridge starts in early September for around six weeks. Most of the work will take place in the verge however temporary traffic lights may be needed at times.

Work between Warwick and Corby Hill is due to start at the end of October for around three weeks. The improvements are being carried out in partnership with Cumbria and Northumbria police forces.

In October work starts on upgrading the junction at Bridge End. This means lowering the A69 under the junction so drivers are able to continue along the route without having to use the roundabout.

As part of the work around 90,000 cubic metres of soil is being removed, two new bridges are being created, new drainage is being installed and the entire junction will be resurfaced.

The improvements, announced by the Department for Transport in the autumn statement back in 2016, are being funded as part of the £220 million Congestion Relief Fund and can only be spent on the Bridge End and Styford work.

To carry out the work a reduced speed limit of 30mph and temporary average speed cameras will be in place for the safety of drivers and the workforce while the junction is upgraded.

Alterations to the roundabout will also be made to allow contractors to work safely on the junction.

The roundabout will be open to traffic by next winter although some work will need to be completed once the new road layout is in place.

Residents and businesses will be invited to an information event that is due to be held in September prior to work starting. Further details will be released shortly.

Before work starts at the junction, some minor resurfacing work will be carried out nearby from Monday 9 September so drivers can continue to have smooth and safe journeys.

Previous Post

Police appeal after south Cumbria burglaries

Next Post

Keswick Spanish Tapas restaurant opens after building damaged in 2015 floods

Have you read?

High-value power tools stolen from vehicle
Latest

Man attacked by teen in racial assault in Barrow park

13/07/2026
TV chef Rosemary Shrager to appear at Taste Cumbria Maryport
News

TV chef Rosemary Shrager to appear at Taste Cumbria Maryport

13/07/2026
Under-pressure South Cumbrian hospital at highest alert
News

Hospitals at highest level of alert after influx of patients

13/07/2026
High-value power tools stolen from vehicle
Latest

A66 set to remain closed for rest of afternoon after serious crash in West Cumbria

13/07/2026
Charity day raises over £17,000 for Gavin Curwen Heart Screening Foundation
Latest

Charity day raises over £17,000 for Gavin Curwen Heart Screening Foundation

13/07/2026
Public invited to have their say on ambitious new plans for a new university campus at the Historic Citadels and surrounding area
News

Events to help shape future of Carlisle

13/07/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.