• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Saturday, July 4, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home News

Lake District road to close for four weeks for improvement work

by Cumbria Crack
30/05/2023
in News
Share on FacebookShare on Twitter
Work on Kirkstone Pass

A Lake District road will close for four weeks for improvement work.

Just over four miles of the A592 between Brothers Water on the northern end and Hird Wood on the southern end of Kirkstone Pass will be closed to vehicles, pedestrians and cyclists from June 5 to June 30.

Contractors will move in to install new safety crash barriers. It is a 24-hour, seven days a week closure, between Brothers Water and the Kirkstone Inn, weather permitting. 

The Kirkstone Inn will remain accessible throughout the closure via Windermere and Ambleside.

Sykeside Camping Park and Brotherswater Inn will remain accessible throughout the closures via Glenridding and businesses in Glenridding, Patterdale and Pooley Bridge will be open as usual and access to these will be via the Penrith end of the A592.

Traffic marshalls will be at either end of the closure and there will be a fully-signed diversion route in place throughout, which will be reviewed regularly, said Westmorland and Furness Council, which is leading the project.

Following the full road closure, temporary traffic signals will then be installed for two weeks starting on Monday July 3. This will also include night-time closures during these two weeks from 7pm to 6am.

Additional road closures will then take place on the following dates, weather permitting.

More information on road diversions will be available nearer the time of each closure:

  • September 11 – for two weeks to carry out full width reconstruction on certain areas, which means excavating the full width of the carriageway.
  • March 1 2024 – a three-week closure to finalise the resurfacing.

The latest work follows on from extensive drainage and associated works completed by contractor Metcalfe Plant Hire Ltd earlier this year.

This included 22 new drainage crossings, new culverts, drainage pipes, gullies and ‘catchpits’ to catch any scree washed off the fells. They have also created more than 200 metres of stone walling and installed new sign bases and three new laybys.

Councillor Peter Thornton, Westmorland and Furness Council’s cabinet member for highways and assets, said: “The work we are carrying out at Kirkstone Pass will not only improve the condition of the road but it will help to protect the road from the effects of flooding and adverse weather and increase the safety and resilience of the route, especially during winter, resulting in fewer enforced closures in the future.”

Previous Post

West Cumbrian town set to hold charity week

Next Post

Dan Bewley reflects on ‘superb’ speedway meetings

Have you read?

Family pays tribute to woman ‘loved beyond words’ after death aged 21
Latest

Family pays tribute to woman ‘loved beyond words’ after death aged 21

04/07/2026
Temporary traffic light
News

Overnight resurfacing for A595 to continue

03/07/2026
Lime House School launches financial support package for families
Sponsored

Lime House School launches financial support package for families

03/07/2026
Firefighters visit residents at West Cumbrian care home
News

Firefighters visit residents at West Cumbrian care home

03/07/2026
Mountain rescue team call out after man breaks leg in West Cumbrian cemetery
Latest

Wild campers help rescue lost walker in Lake District

03/07/2026
University of Cumbria radiography students help unlock Roman secrets
News

University of Cumbria radiography students help unlock Roman secrets

03/07/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.