• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Wednesday, July 1, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home News

Launch of Fundraising Campaign to Support Reconnection of Keswick to Threlkeld Railway Path

by Cumbria Crack
23/01/2018
in News
Share on FacebookShare on Twitter
View of Brundholme Bridge through Little Tunnel towards Braithwaite: Credit Keswick Tourism Association

[W]orking with the Lake District National Park Authority the Lake District Foundation is launching a fundraising campaign to raise funds for the reconnection of the Keswick to Threlkeld Railway Path.

The Foundation is keen to enlist the help and support of local businesses and community groups in this campaign. Heather Askew, fundraiser for the Lake District Foundation said “I know how much we all miss having this fantastic route available, whether it’s for a family walk, a training run or a cycle ride. This accessible route has so much to offer for both locals and visitors and is a vital connection between Threlkeld and Keswick. This fundraising campaign will help support the cost of getting this route fully restored. I hope that local businesses and community groups in Threlkeld and Keswick will be keen to get involved and support this project.”

The flooding in December 2015 caused extensive damage to the trail, 2 bridges were unseated from their abutments and irreparably damaged, a third was badly damaged, 200m of path embankment was washed away and undercutting of the bank below is threatening the long-term stability of the boardwalk section.

The LDNPA intend to largely reinstate the original route, including work to replace the two missing bridges, to repair the third bridge, to re-route the trail around the missing section of embankment and to reopen the original railway tunnel to replace the raised boardwalk section. Planning permission for the work is being applied for in March 2018 and the project is expected to cost around £5.4 million. The LDNPA anticipate that Phase 1 (Design) will be complete by July 2018 with the designs and necessary environmental and planning consents in place. Subject to securing match funding phase 2 (Construction) could start as early as summer 2018. The LDNPA will be sharing designs for the reconnection during February 2018.

In December 2017 the LDNPA were delighted to announce a major funding boost to the project – a £2.5 million grant from Highways England and a partnership with the Lake District Foundation to jointly fundraise the shortfall of around £3 million.

As well as a plea to local businesses and community groups to get involved with the campaign, you can give directly by:

Visiting www.lakedistrictfoundation.org/keswick-to-threlkeld to donate online or

Texting “KTOT18 £10” to 70070 to donate £10 to the campaign

If you would like to get involved in the campaign you can email Heather Askew [email protected]

Previous Post

UHMBT announces first Exemplar Status Wards

Next Post

Commissioner welcomes support from the public and Police and Crime Panel

Have you read?

Two taken to hospital after Carlisle crash
Latest

Person airlifted to hospital after A66 multi-vehicle crash

01/07/2026
Lithium-ion battery likely cause of Workington scrapyard fire
Latest

Lithium-ion battery likely cause of Workington scrapyard fire

01/07/2026
Wilderness Way to host open evening to highlight life-changing roles on offer
Sponsored

Wilderness Way to host open evening to highlight life-changing roles on offer

01/07/2026
Person airlifted to hospital with burns after A596 car fire
Latest

Person airlifted to hospital with burns after A596 car fire

01/07/2026
Listen: Success for Workington Academy students’ podcast
News

Listen: Success for Workington Academy students’ podcast

01/07/2026
High-value power tools stolen from vehicle
News

Appeal after teenager involved in Carlisle car crash

01/07/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.