• Contact us
  • Advertise with us
  • Cumbria Crack app
  • About us
Monday, June 8, 2026
cumbriacrack.com
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs
No Result
View All Result
cumbriacrack.com
No Result
View All Result
Home News

Work paused on the Carlisle Flood Risk Management Scheme for the winter

by Cumbria Crack
21/10/2019
in News
Share on FacebookShare on Twitter

The Environment Agency has taken the decision to temporarily pause construction of Phase 1 of the Carlisle flood risk management scheme during the winter months.

Since construction started in July 2019, we have encountered the wettest August and September in the last 30 years according to the Met Office.  This has made working conditions for machinery and our teams on the ground difficult for both the in river works and embankment construction.

Works to date have been focussed in the Warwick Road area.  The decision to pause has not been taken lightly and we consider it will be of greater benefit in the long run to pause rather than attempt to carry on through winter when we are likely to make little progress.  Much of our plant and equipment will be moved from Melbourne Park from the end of October and will return in 2020.

The change in the works timetable will not increase the flood risk to the local area. In addition to this flood scheme we have been preparing for the wetter winter period. Our 2019 winter readiness plans remain unchanged and include: replacing flood gates at the Caldew Maltings; control panel repairs at Little Caldew pumping station; repairs to flood embankments at Willowholme and Parham Beck; repairs to Durranhill flood storage basin; as well as regularly removing blockages and debris that would have increased flood risk.

Stewart Mounsey, flood manager for Cumbria, said: ‘I would like to reassure people that pause doesn’t mean stop. We will be busy behind the scenes working with our designers and contractor to plan our works for an accelerated start in spring 2020.  Although we won’t be building embankments in the winter the public may see some activity in the winter months that will be supporting the accelerated return.

‘The pause does not affect the completion of our works which were originally planned for spring 2020 to enable the new defences to be built ahead of winter 2020. Pausing main construction works in winter 2019 will not affect our 2020 winter readiness or our ongoing preparations for delivery of Phases 2 and 3.’

We can never fully protect people from future flooding, so we would ask residents at risk of flooding to prepare in advance by going online at https://flood-warning-information.service.gov.uk/warnings and signing up for free flood warnings. Alternatively, they can telephone the Environment Agency Floodline on 0345 988 1188 and find out what they can do to protect themselves and their property when flooding hits.

Previous Post

M6 northbound blocked near Carlisle after shed load of hay bales

Next Post

Funding awarded to local groups in Barrow

Have you read?

Today’s mobile speed camera van locations
News

Speed camera vans in Cumbria today

08/06/2026
Bid to turn former West Cumbrian electrical shop into furniture storage unit
News

Bid to turn former West Cumbrian electrical shop into furniture storage unit

08/06/2026
Carlisle Unity Festival returns to city
News

Carlisle Unity Festival returns to city

08/06/2026
Appeal for woman missing from Whitehaven
News

Appeal for woman missing from Whitehaven

07/06/2026
Casualty suffers burns after Carlisle fire on open ground
News

Building fire causes delays on A591

07/06/2026
A generic picture of police tape running across a road and police cars are in the background
News

A595 closed in both directions following crash

07/06/2026

Subscribe to Our Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • Home
  • News
  • Business
  • Sport
  • Carlisle United
  • What’s on
  • Jobs

Useful links

  • Contact us
  • Send a sport report
  • Get our app
  • Advertise with us
  • About us

Follow us on

Newsletter

Subscribe to our mailing list to receive daily updates direct to your inbox!

*We hate spam as much as you do. Privacy Statement

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

Terms & Conditions / Privacy Policy / Cookie Policy
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Sport
    • All sport
    • Carlisle United
  • Business
  • What’s on
  • Food & drink
  • Jobs

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.